Solar Panels Great Dunmow

Play Video

environmentally

Energy for a sustainable and environmentally friendly society.

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat mattis dapibus nunc sem eros dapibus quis faucibus eget vestibulum quis magna.

Save your money

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.

Certified Engineers

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.

Consultation & Planning

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.

Best Energy company and award

benefit from almost 20 years of experience.

How It work

Our company makes it easy for you to work on your project

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Pellentesque sit amet iaculis diam.

find the best location

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

estimate cost for the project

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

Project Work Execution

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

Launch prototype project

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

What to Expect

Learn about the installation process

Get informed about the installation process for our solar panels.

1. Solar Engineer's Survey

In depth technical solar survey carried out by a professional solar qualified engineer.

2. Personalized Solar System

Detailed design and specification of the solar system suited to your needs.

2. Scaffolding installation planning

Scaffolding erected (if required) at a time and date agreeable with yourselves.

4. Installation & Construction

Installation (usually completed within 1-2 days) site permitting. All testing and commissioning. Monitoring platform built. Start generating electricity.

5. Scaffold Erection

Once you are happy with the installation the scaffolding will be arranged to be struck.

6. Paperwork handover

- MCS
- Electrical certificate
- Building control notification
- Insurance backed by 'HIES'
- DNO notification (if required)

Let's start project & Check Our price

Area’s Nearby Great Dunmow We Cover

Interesting Facts About Great Dunmow

History of Great Dunmow

A Roman small town developed on the junction between Stane Street and the Roman roads which ran northeast to southwest from Sudbury to London, and northwest to southeast from Cambridge to Chelmsford. The main settlement area spread westwards from the road junction, with cemeteries on the outskirts. There was a second Roman settlement at Church End immediately to the north of present-day Great Dunmow; the site likely included a rural Roman Temple.

Between the occupation by the Romans and the time of the Saxons, the town acquired its name: in AD951 it was named Dunemowe, and later Dommawe.[citation needed] In the Domesday Book of 1086, the area including Great Dunmow and Little Dunmow had seven manors. Some of these still exist – in name at least – including Bigods, Newton Hall (seat of the Henniker baronets), Merks Hall, Minchins and Shingle Hall. The earliest record of a church in the town is in 1045, and in 1197 Geoffrey de Dunmow was rector.

General Info

Great Dunmow is a historic market town and civil parish in the Uttlesford district of Essex, England. It lies to the north of the A120 road, approximately midway between Bishop’s Stortford and Braintree, 5 mi (8 km) east of London Stansted Airport.

Originally the site of a Roman settlement on Stane Street, the town thrived during the Middle Ages. Dunmow means “Meadow on the Hill”. The settlement was variously referred to as Dunmow Magna, Much Dunmow, or most commonly Great Dunmow.