environmentally
Energy for a sustainable and environmentally friendly society.
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat mattis dapibus nunc sem eros dapibus quis faucibus eget vestibulum quis magna.
Save your money
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.
Certified Engineers
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.
Consultation & Planning
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.
Best Energy company and award
benefit from almost 20 years of experience.
How It work
Our company makes it easy for you to work on your project
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Pellentesque sit amet iaculis diam.
find the best location
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
estimate cost for the project
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
Project Work Execution
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
Launch prototype project
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
What to Expect
Learn about the installation process
Get informed about the installation process for our solar panels.
1. Solar Engineer's Survey
In depth technical solar survey carried out by a professional solar qualified engineer.
2. Personalized Solar System
Detailed design and specification of the solar system suited to your needs.
2. Scaffolding installation planning
Scaffolding erected (if required) at a time and date agreeable with yourselves.
4. Installation & Construction
Installation (usually completed within 1-2 days) site permitting. All testing and commissioning. Monitoring platform built. Start generating electricity.
5. Scaffold Erection
Once you are happy with the installation the scaffolding will be arranged to be struck.
6. Paperwork handover
- MCS
- Electrical certificate
- Building control notification
- Insurance backed by 'HIES'
- DNO notification (if required)
Let's start project & Check Our price
Interesting Facts About Billericay
History of Billericay
Some of the earliest records of human occupation of Billericay are the burial mounds in Norsey Wood, showing evidence of occupation in the Bronze and Iron Ages. Evidence of Roman occupation has been found at a number of locations in the town and there may have been a small cavalry fort at Blunts Wall.
The Saxons did not settle in the centre of Billericay. They established themselves two miles (three kilometres) south, at Great Burstead. In the late 10th century, it was known as “Burhstede”. Billericay was not mentioned in the Domesday Book of 1086, as it lay within Great Burstead. At this time, the parish church for Billericay was at St Mary Magdalene, Great Burstead. By the 14th century a chantry chapel had been built on the High Street in Billericay, which became a chapel of ease to Great Burstead following the Reformation, eventually becoming a parish church in 1844, also dedicated to St Mary Magdalen.
General Info
There are three tiers of local government covering Billericay, at parish (town), district and county level: Billericay Town Council, Basildon Borough Council and Essex County Council. The town council has its headquarters at the Chantry Centre on Chantry Drive, which was purpose-built for the council in 2020 and also serves as a community centre. The town council has run a youth town council scheme since 1998, elected in schools around the town.