environmentally
Energy for a sustainable and environmentally friendly society.
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat mattis dapibus nunc sem eros dapibus quis faucibus eget vestibulum quis magna.
Save your money
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.
Certified Engineers
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.
Consultation & Planning
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.
Best Energy company and award
benefit from almost 20 years of experience.
How It work
Our company makes it easy for you to work on your project
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Pellentesque sit amet iaculis diam.
find the best location
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
estimate cost for the project
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
Project Work Execution
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
Launch prototype project
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
What to Expect
Learn about the installation process
Get informed about the installation process for our solar panels.
1. Solar Engineer's Survey
In depth technical solar survey carried out by a professional solar qualified engineer.
2. Personalized Solar System
Detailed design and specification of the solar system suited to your needs.
2. Scaffolding installation planning
Scaffolding erected (if required) at a time and date agreeable with yourselves.
4. Installation & Construction
Installation (usually completed within 1-2 days) site permitting. All testing and commissioning. Monitoring platform built. Start generating electricity.
5. Scaffold Erection
Once you are happy with the installation the scaffolding will be arranged to be struck.
6. Paperwork handover
- MCS
- Electrical certificate
- Building control notification
- Insurance backed by 'HIES'
- DNO notification (if required)
Let's start project & Check Our price
Area’s Nearby Luton We Cover
Interesting Facts About Luton
History of Luton
Luton is believed to have been founded by the Anglo-Saxons sometime in the 6th century. Its name first appears in the 8th century as Lygetun, meaning “town on the River Lea”.
The Domesday Book records Luton as Loitone and as Lintone. Agriculture dominated the local economy at that time, and the town’s population was around 700 to 800.
St Mary’s Church, Luton town centre
The Wenlock chapel within St Mary’s
In 1121 Robert, 1st Earl of Gloucester started work on St Mary’s Church in the centre of the town. The work was completed by 1137. A motte-and-bailey castle which gives its name to the modern Castle Street was built in 1139 but demolished by 1154.
The hat making industry began in the 17th century and became synonymous with the town
General Info
Luton is a town and unitary authority with borough status in Bedfordshire, England, with a population at the 2021 census of 225,262.
Luton is on the River Lea, 32 miles (50 km) north-west of London, 18 miles (29 km) north-west of Hertford, 20 miles (32 km) south of Bedford and 23 miles (37 km) south-east of Milton Keynes. The town’s foundation dates to the sixth century as a Saxon settlement on the river, from which Luton derives its name. Luton is recorded in the Domesday Book as Loitone and Lintone. One of the largest churches in Bedfordshire, St Mary’s Church, was built in the 12th century. There are local museums which explore Luton’s history in Wardown Park and Stockwood Park.