environmentally
Energy for a sustainable and environmentally friendly society.
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat mattis dapibus nunc sem eros dapibus quis faucibus eget vestibulum quis magna.
Save your money
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.
Certified Engineers
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.
Consultation & Planning
Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.
Best Energy company and award
benefit from almost 20 years of experience.
How It work
Our company makes it easy for you to work on your project
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Pellentesque sit amet iaculis diam.
find the best location
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
estimate cost for the project
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
Project Work Execution
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
Launch prototype project
Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.
What to Expect
Learn about the installation process
Get informed about the installation process for our solar panels.
1. Solar Engineer's Survey
In depth technical solar survey carried out by a professional solar qualified engineer.
2. Personalized Solar System
Detailed design and specification of the solar system suited to your needs.
2. Scaffolding installation planning
Scaffolding erected (if required) at a time and date agreeable with yourselves.
4. Installation & Construction
Installation (usually completed within 1-2 days) site permitting. All testing and commissioning. Monitoring platform built. Start generating electricity.
5. Scaffold Erection
Once you are happy with the installation the scaffolding will be arranged to be struck.
6. Paperwork handover
- MCS
- Electrical certificate
- Building control notification
- Insurance backed by 'HIES'
- DNO notification (if required)
Let's start project & Check Our price
Area’s Nearby Tilbury We Cover
Interesting Facts About Tilbury
History of Tilbury
Tilbury A power station was planned from 1947 by the County of London Electricity Supply Company Limited. Following the nationalisation of the electricity industry in 1948 the plans were taken forward successively by the British Electricity Authority, the Central Electricity Authority and from 1958 the Central Electricity Generating Board. Construction of Tilbury A was sanctioned in 1950 and began in 1951 and was initially commissioned in 1956 by the Central Electricity Authority. After operating for 25 years the A station was mothballed by the CEGB in 1981 and eventually demolished in 1999, mostly everything including the turbine hall was demolished. The waste water and a small part of the station remained due to being a listed building The site was entirely cleared in 2019 for the construction of the Tilbury2 port.
General Info
The Tilbury power stations were two thermal power stations on the north bank of the River Thames at Tilbury in Essex. The 360 MW dual coal- and oil-fired Tilbury A Power Station operated from 1956 until 1981 when it was mothballed, prior to demolition in 1999. The 1,428 MW Tilbury B Power Station operated between 1968 and 2013 and was fueled by coal, as well as co-firing with oil and, from 2011, biomass. Tilbury B was demolished in 2016–19. Since 2013 three other power stations have been proposed or constructed in Tilbury.