Solar Panels Saffron Walden

Play Video

environmentally

Energy for a sustainable and environmentally friendly society.

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat mattis dapibus nunc sem eros dapibus quis faucibus eget vestibulum quis magna.

Save your money

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.

Certified Engineers

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.

Consultation & Planning

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.

Best Energy company and award

benefit from almost 20 years of experience.

How It work

Our company makes it easy for you to work on your project

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Pellentesque sit amet iaculis diam.

find the best location

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

estimate cost for the project

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

Project Work Execution

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

Launch prototype project

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

What to Expect

Learn about the installation process

Get informed about the installation process for our solar panels.

1. Solar Engineer's Survey

In depth technical solar survey carried out by a professional solar qualified engineer.

2. Personalized Solar System

Detailed design and specification of the solar system suited to your needs.

2. Scaffolding installation planning

Scaffolding erected (if required) at a time and date agreeable with yourselves.

4. Installation & Construction

Installation (usually completed within 1-2 days) site permitting. All testing and commissioning. Monitoring platform built. Start generating electricity.

5. Scaffold Erection

Once you are happy with the installation the scaffolding will be arranged to be struck.

6. Paperwork handover

- MCS
- Electrical certificate
- Building control notification
- Insurance backed by 'HIES'
- DNO notification (if required)

Let's start project & Check Our price

Area’s Nearby Saffron Walden We Cover

Interesting Facts About Saffron Walden

History of Saffron Walden

Archaeological evidence suggests continuous settlement on or near the site of Saffron Walden from at least the Neolithic period. It is believed that a small Romano-British settlement and fort – possibly in the area round Abbey Lane – existed as an outpost of the much larger settlement of Cestreforda to the north.

After the Norman invasion of 1066, a stone church was built. Walden Castle, dating from about 1140, may have been built on pre-existing fortifications. A priory, Walden Abbey, was founded under the patronage of Geoffrey de Mandeville, 1st Earl of Essex about 1136, on the site of what is now Audley End House. The abbey was separated from Walden by Holywell Field. After the dissolution of the monasteries, Sir Thomas Audley converted its cloisters into a dwelling. Later this became the site of Audley End House.

General Info

Saffron Walden is a market town in the Uttlesford district of Essex, England, 12 miles (19 km) north of Bishop’s Stortford, 15 miles (24 km) south of Cambridge and 43 miles (69 km) north of London. It retains a rural appearance and some buildings of the medieval period. The population was 15,504 at the 2011 census and 16,613 in the 2021 census.