Solar Panels South Woodham Ferrers

Play Video

environmentally

Energy for a sustainable and environmentally friendly society.

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat mattis dapibus nunc sem eros dapibus quis faucibus eget vestibulum quis magna.

Save your money

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.

Certified Engineers

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.

Consultation & Planning

Maecenas finibus ligula vel pharetra scelerisque duis semper ex in erat.

Best Energy company and award

benefit from almost 20 years of experience.

How It work

Our company makes it easy for you to work on your project

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Pellentesque sit amet iaculis diam.

find the best location

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

estimate cost for the project

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

Project Work Execution

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

Launch prototype project

Lorem ipsum dolor sit amet consectetur adipiscing elit sit amet iaculis diam duis pretium eu.

What to Expect

Learn about the installation process

Get informed about the installation process for our solar panels.

1. Solar Engineer's Survey

In depth technical solar survey carried out by a professional solar qualified engineer.

2. Personalized Solar System

Detailed design and specification of the solar system suited to your needs.

2. Scaffolding installation planning

Scaffolding erected (if required) at a time and date agreeable with yourselves.

4. Installation & Construction

Installation (usually completed within 1-2 days) site permitting. All testing and commissioning. Monitoring platform built. Start generating electricity.

5. Scaffold Erection

Once you are happy with the installation the scaffolding will be arranged to be struck.

6. Paperwork handover

- MCS
- Electrical certificate
- Building control notification
- Insurance backed by 'HIES'
- DNO notification (if required)

Let's start project & Check Our price

Area’s Nearby South Woodham Ferrers We Cover

Interesting Facts About South Woodham Ferrers

History of South Woodham Ferrers

The area now occupied by South Woodham Ferrers was sparsely populated farmland until the railway station opened in 1889. The station was originally called “Woodham Ferris”, having been built to serve the nearby village of Woodham Ferrers, which stands on a hill 1 mile (1.6 km) north of the station. South Woodham Ferrers developed gradually around the station, with some of the farmland being parcelled up into plots for sale to individuals and developers. In 1974 Essex County Council adopted a masterplan to significantly expand South Woodham Ferrers with large housing estates and other facilities, including a new town centre.

The area remained part of the civil parish of Woodham Ferrers until 1 April 1987, when it was made a separate parish.

Many street names in the southwestern part of the town are taken from the works of J. R. R. Tolkien, such as Gandalf’s Ride, Gimli Watch, Shirebourn Vale, Rivendell Vale, Celeborn Street, Hobbiton Hill and Arwen Grove.

General Info

South Woodham Ferrers is a town and civil parish in the City of Chelmsford in Essex, England. It is approximately 35 miles (56 km) east of London and 8 miles (13 km) south-east of Chelmsford, and had a population of 16,453 at the 2011 Census, a decrease from 16,629 at the 2001 Census.

The town is situated east of Fenn Creek, near to where it meets the River Crouch. South Woodham Ferrers is part of the Maldon constituency represented by Sir John Whittingdale MP.